Put plant availability into the receiving network’s perspective.
Connect generation units, plant equipment and availability information with the constraints at the agreed grid connection.
Discuss this applicationThe operating challenge
Generation and connection coordination
A plant’s available output is only one part of the operating decision. The receiving network has its own limits, outages and priorities, while the generation operator remains responsible for its own assets.
The Auri Energy approach
Bring the pieces together.
Configure the Cetus scope around the generation company or independent power producer’s equipment and connection boundary. Share approved availability and constraint records with the relevant operator through the agreed interface.
A clearer basis for the next decision.
Give planning and coordination teams a clearer basis for discussing output, limitations and future requirements. The exchange does not give one operator direct access to another operator’s database or control authority.
Read the relevant Cetus guideInformation that matters
Start with the right inputs.
- Generating units, collectors and step-up equipment
- Declared availability and plant operating limits
- Grid connection agreements and approved exchange records
From information to action
How the work comes together.
- Define the plant’s assets and connection boundary.
- Connect availability information with its operating limits.
- Coordinate with the receiving operator using approved records.
Related applications
Grid capacity coordination
Bring distribution constraints, transmission needs and connected-resource availability into a shared capacity discussion.
Explore the applicationGrid twins and network planning
Bring equipment, connections, measurements and assumptions together before assessing a change to the grid.
Explore the applicationSecure operations and lifecycle
Bring equipment identity, access, configuration and update records into a controlled engineering process.
Explore the applicationBring us your network challenge.
Tell us about the equipment, the information you have and the decision you need to make. We will help define a practical starting scope.