Auri Energy / Grid capacity coordination
Make the boundary between operators more useful.
Bring distribution constraints, transmission needs and connected-resource availability into a shared capacity discussion.
Discuss this applicationThe operating challenge
Grid capacity coordination
A transmission operator needs to understand what a distribution area can offer without taking over its systems. A generation team needs to know how plant availability relates to connection constraints. Each party sees part of the picture.
The Auri Energy approach
Bring the pieces together.
Cetus Grid Capacity Coordination is designed around a time-qualified boundary view: import and export headroom, reactive-power range, duration, ramp limits and the constraint that determines the result. Existing operator information comes first; targeted field measurements address agreed gaps.
A clearer basis for the next decision.
Begin with an advisory proof of concept alongside existing control-room practice. Dynamic capacity envelopes require commissioned models, validated calculations and agreed source information. Each operator keeps its own installation and shares only approved records through a defined protocol connection.
Read the relevant Cetus guideInformation that matters
Start with the right inputs.
- Agreed transmission–distribution or generation connection boundary
- Network constraints, operating limits and resource availability
- Time, forecast horizon, measurement coverage and confidence
From information to action
How the work comes together.
- Agree the boundary, information exchange and operating authority.
- Commission the sources, model and calculation scope.
- Evaluate advisory results and the reasons for constrained or withheld capacity.
Related applications
SCADA and station integration
Connect existing relays, RTUs, meters and station systems with local records and the broader Cetus network view.
Explore the applicationGrid twins and network planning
Bring equipment, connections, measurements and assumptions together before assessing a change to the grid.
Explore the applicationGeneration and connection coordination
Connect generation units, plant equipment and availability information with the constraints at the agreed grid connection.
Explore the applicationBring us your network challenge.